Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | Jiangsu,China |
---|---|
Brand Name: | DINGBO |
Certification: | CE ISO SGS |
Model Number: | DBRF |
Minimum Order Quantity: | 1 set |
Price: | USD18000-25000/set |
Packaging Details: | 1.nude package and fixed by steel rope. 2.A full set of 40GP container. |
Delivery Time: | Shipped in 30-70 days after payment |
Payment Terms: | T/T, L/C, Western Union |
Supply Ability: | 20sets/month |
Production Capacity: | 10-15m/min | Power(w): | 5.5kw |
---|---|---|---|
Tile Type: | C Z Purlin Roll Forming Machine Light | Control System: | PLC With Touch Screen |
Roller Material: | 45# Steel Chrome-faced | Thickness: | 1.2-2.5mm |
Raw Material: | Ppgi,Steel,Galvanized Sheet | ||
High Light: | C Channel Purlin Roll Forming Machine,2.5mm Purlin Roll Forming Machine,Galvanized steel Roll Forming Machine |
Product Descriptions
C section is C purlin is usually used for roofs and walls. It is best to use continuous beam structure, because the roof needs to withstand the weight of snow and wind. Due to the failure of overlap, C purlin can only form a simple support rather than a continuous beam structure. This is why C purlin bar is mainly used for wall purlin and Z purlin for roof purlin.
Profile drawing to design
Working Flow
Decoiler -- leveling -- Pre-punching -- roll forming part -- straightening -- hydraulic cutting -- runout table
Product Parameters
Name | Specification |
Raw material type | Steel coil/Galvanized coil(optional) |
Thickness | 1.5-3.0mm |
Work pressure | 12mpa |
Roller material | GCr15/Cr12 |
Forming Stations | 14stations |
Color | customer's requirement |
Control type | PLC |
Driven type | By chain |
Main power | 16kw |
Cutting Blade Material | Cr12Mov |
Main Components
Name | Quantity |
Manual decoiler | 1 set |
Punching machine | 1 set |
Main forming machine | 1 set |
PLC control system | 1 set |
Hydraulic pump station | 1 set |
Pre-cutting/Post cutting | 1 set |
Electric motor | 1 set |
Output table | 1 set |
Pictures
Customers visiting
Packing case
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
7. Q: How to place order ?
Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment
8.What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.