Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | China, Jiangsu |
---|---|
Brand Name: | Shenghong |
Certification: | CE ISO |
Model Number: | SH16-06-05-14 |
Minimum Order Quantity: | 1 sets |
Price: | Negotiation |
Packaging Details: | Container |
Delivery Time: | 40 days after payment |
Payment Terms: | T/T |
Supply Ability: | 30 SETS/ MONTH |
Use: | Wall | Power(W): | 3kw |
---|---|---|---|
Production Line Speed: | 8-12m/min | Voltage: | 380v(or As Your Required) |
Certification: | CE/ISO | Control System: | Fully Automatic |
High Light: | door frame making machine,frame making equipment |
Click on the below ficture to see the video:
What is the details?
Manual Decoiler |
1 Material coil inner diameter: 300mm- 2 Carrying capacity: 2T |
Forming Device |
1.Number of forming steps: 13steps 2.Shaft material: 45# steel with harden treatment, outer diameter 80mm 3 Roller material: 45# steel 4.rollers crome coated: chromeplate 5. Main motor power: 3.0kw 6.Cutter power:3.5kw 8. Forming speed: 8-10 m/min 7. Voltage:380V/50Hz/3 phrase 8.Weight: about 1.5 T 9. Size:5000*800*800mm 10.Type of cutting: hydraulic cutting 11.Diameter of shaft:70mm 12.Structure:400 H Beam Welded 13 Sizes of chain: 1.5 inch inner side |
Cutting Device |
1.Stop to Punching, Stop to Cutting, post punch, Post Cut, no slug 2. Hydraulic motor: 3.0Kw 3.Cutting tool material: Cr12, Heat treatment |
Control Device |
1. English and Chinese exchange 2 Ombined with: PLC, Inverter , Encoder, etc 3. Cut-to-length tolerance≤±2 mm 3. Control Voltage 24V 4 PLC brand :panasonic |
|
|
Payment Terms |
Payment:T/T(50% down payment in advance,50% when see the B/L Copies.) (3)Delivery: within 30 working days after receipt of deposit. |
Warranty | Tow years, and we will provide the technical support for the whole life. |
Packing |
The subject can be loaded in one 40’ GP container. Packing style: Naked |
Our machine | Other company 's machine | Influence of the machine | |
Machine's base | High strength H350 / H400 steel. machine through milling macine after welding | H270 steel mark, after welding use manual polish | keep base in the same horizontal line, ensure product standard |
Roller material | High grade No.45 forged steel, with digital-controlled procession, Plated with 5 um chrome coated | Normal No. 20 steel with Simple polished and have no coating | Roller will have longer use life and ensure the products have same size,no nick on the surface. |
Side wall | Use high strength16mm thickness steel panel mark | Use 12 mm thickness steel panel mark | Ensure machine harder to deform, keep the product accurate and stable |
Active shaft material | High grade solid No.45 carbon steel, Shaft diameter is 72mm. surface CNC polish treatmen | Normal No. 45 steel with no surface treatment | Improve the integrated mechanic feature of the shaft. and ensure the shaft stability keep product standard |
Electrical elements | PLC control panel, transducer imported from Mitsubishi of Japan. Other elements from famous suppliers in China | All the elements are made in china | Machine become more accurate and more stable |
Cutter blade | Cr12 mould steel with quenched treatment | Normal high strength steel without quenched treatment |
Stable the integrated mechanic feature of the cutter blade,harder to deform, longer blade's life, ensure product standard |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)