Place of Origin: | China, Jiangsu |
---|---|
Brand Name: | Shenghong |
Certification: | CE ISO |
Model Number: | SH16-06-05-05 |
Minimum Order Quantity: | 1 sets |
Price: | Negotiation |
Packaging Details: | Container |
Delivery Time: | 40 days after payment |
Payment Terms: | T/T |
Supply Ability: | 30 SETS/ MONTH |
Material Of Rollers: | 45# Steel | Production Capacity: | 8-10m/min |
---|---|---|---|
Power(W): | 5.5 Kw | Step Of Rollers: | 13 |
Thickness: | 0.5-1.5mm | Certification: | ISO9001 And CE |
High Light: | cold forming machine,cold rolling machine |
Drawing for you reference:
Material specification | Aluminum, galvalume, galvanized and pre-painted galvanized steel. |
Thickness | 0.3 mm to 0.7mm. |
Main motor power | 4 kw. |
Hydraulic station power | 3 kw. |
Feeding width | Depends on the model of profile. |
Yield stress | 235Mpa(33KSI) ~ 345Mpa (50KSI). |
Roll forming Speed | 12 m/minute. |
Cutting Tolerance | +/-2.5mm(length≤5000mm); +/-3.0mm(5000mm<length≤10000mm). |
Manual Uncoiler | Max. Capacity: 3000kgs. |
Coil inner diameter | 508mm. |
Voltage | As per customer’s request. |
Numbers of stands | 12 stands/stations/pairs for each roll forming system. |
Type of cutting | Roll-formed and length-set profile cutting. |
Roller Material | High grade No.45 forged steel, coated with hard chrome. |
Active Shaft Material |
High grade No.45 carbon wrought steel, which can improve the integrated mechanic feature of the shaft. |
Electric Elements |
PLC control panel, transducer imported from Mitsubishi of Japan. Other elements are from famous suppliers of China. |
Cutter blades | Cr12 mould steel with quenched treatment. |
Uncoiling the sheet --- Infeed guiding --- Roll forming --- Rectifying the straightness ---
--- Measure length --- Cutting the panel --- panels to the supporter (option: automatic stacker).
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.